Another FastPatch® HPRE-MD Installation on Maryland's Purple Line

FastPatch® HPRE-MD was again an essential part of a recent embedded track installation for Maryland Transit’s Purple Line. This time we were back for the second rail installation on the Sligo Creek Bridge, a key step in the Purple Line link between communities from New Carrollton to Bethesda.

HPRE-MD was the trusted rail grout solution for this application in cold weather on a sloped location, with quick installation & cure time.

  • 1800 gallons of HPRE-MD with slope grade additive
  • 10 hours total installation time, 2 days
  • Set time 8 minutes
  • Absorbs sound & vibration
  • Provides electrical isolation

Watch how FastPatch® HPRE-MD was installed in this project